Brahmand NewsPrevious Article
Brahmand NewsNext Article

DCNS completes first hull section of Duguay-Trouin nuke-sub


Section of the hull is made ​​of steel alloy, has a diameter of about 9 m, length 4 m and a mass of 40 tons. Photo: DCNS

CHERBOURG (BNS): DCNS has completed the production of the first hull section of the Duguay-Trouin, the second in class of the Barracuda type nuclear-powered attack submarine for French Navy.

Under the Barracuda programme, the French defence procurement agency (DGA) has ordered six submarines to DCNS which will be delivered in between 2017 and 2028.

The company will now fabricate the remaining hull elements for the Duguay-Trouin — 20 other hull sections and 4 interface pieces — in the next few months.

The Barracuda next-generation nuclear-powered attack submarines, or SSNs (French designation SNA-NG), will be a key component of the French Navy’s force projection assets.

In addition to anti-surface and anti-submarine warfare, the Barracuda’s mission capabilities will include intelligence gathering, special operations (by deploying commandos) and land strikes, with the MDCN naval cruise missile.

Barracuda SSNs will carry a range of armaments, including the future heavyweight torpedo, the SM39 antiship missile and the MDCN.

Tags:

Other Related News

Top Army commanders begin 4-day deliberations

Top commanders of the Indian Army have begun deliberations on national security challenges along the borders with China and Pakistan besides ways to boost the force's overall combat capability in the backdrop of the evolving regional security situation.

BRAHMOS Missile Systems

Headlines

Brahmand World Defence Update 2024

Brahmand World Defence Update

Image Gallery

Main Menu
 Comment TagsColor of comment tags right next to article titles Links ColorColor of Hyperlinks Background ColorBackground color & image
Background TextureChoose Background Texture