Brahmand NewsPrevious Article
Brahmand NewsNext Article

Construction begins on 5th ship in ESB programme for US Navy


An internet imagery.

SAN DIEGO (BNS): General Dynamics NASSCO, a wholly owned subsidiary of General Dynamics, has begun construction on a fifth ship for the US Navy’s Expeditionary Transfer Dock (ESD)/Expeditionary Sea Base (ESB) program.

Designed to provide advanced flexibility and capability for sea-to-shore missions, the newest ESB will include a 52,000 square-foot flight deck, fuel and equipment storage, repair spaces, magazines, mission planning spaces and accommodations for up to 250 personnel.

Serving as a ‘pier at sea,’ the 784-foot-long ship is also designed to support MH-53 and MH-60 helicopters and MV-22 tilt rotor aircraft.

The ship, ESB 5, is the fifth to be added to a contract between NASSCO and the US Navy that originally called for two Expeditionary Transfer Docks - USNS Montford Point (T-ESD 1) and USNS John Glenn (T-ESD 2).

The first two ships, formerly classified as Mobile Landing Platforms (MLPs), were designed and constructed by NASSCO to support vehicle staging and transfers, and the movement of LCAC vessels.

In 2012, a third ship, USNS Lewis B. Puller (T-ESB 3), was added to the contract and reconfigured as an ESB, formerly known as a MLP Afloat Forward Staging Base, to support a wide range of military operations. All three ships have been delivered to the U.S. Navy, and in October 2015, NASSCO began construction on ESB 4, USNS Hershel “Woody” Williams, the Company said.

Tags:

US  Navy  Ship  GD  NASSCO  Military  

Other Related News

GRSE secures research vessel order from naval lab under DRDO

Defence PSU Garden Reach Shipbuilders and Engineers (GRSE) Ltd has signed a contract with the Naval Physical and Oceanographic Laboratory (NPOL) for construction of an acoustic research ship.

BRAHMOS Missile Systems

Headlines

Brahmand World Defence Update 2024

Brahmand World Defence Update

Image Gallery