Brahmand NewsPrevious Article
Brahmand NewsNext Article
Headlines
  • Wreckage of missing Sukhoi-30 jet fighter found in Assam:-The wreckage of the IAF Sukhoi fighter jet that went missing with two crew members on board was found on Friday after three days of search operations....
  • MAST ASIA 2017:-MAST Asia 2017, Japan's only international 'Maritime/Air Systems & Technologies International Trade Show, Conference and Community Enabler' will be held in Makuhari Messe, Tokyo, Japan from 12th to 14th June, 2017....
  • US Navy's new Ford-class carrier sets sail for acceptance trials:-The Navy's next generation aircraft carrier, the nuclear-powered USS Gerald R Ford (CVN 78), has departed the Naval Station Norfolk for acceptance trials, paving the way for the warship's commissioning into service later this year....
  • India-Singapore joint naval exercise SIMBEX 2017 concludes:-The Indian Navy and the Singapore Navy have concluded a week-long bilateral military exercise in the South China Sea, during which they conducted a series of advanced naval warfare drills, including air defence exercises and gunnery live-firings....

Construction begins on 5th ship in ESB programme for US Navy

Article
Line Spacing+- AFont Size+- Print This Article

An internet imagery.

SAN DIEGO (BNS): General Dynamics NASSCO, a wholly owned subsidiary of General Dynamics, has begun construction on a fifth ship for the US Navy’s Expeditionary Transfer Dock (ESD)/Expeditionary Sea Base (ESB) program.

Designed to provide advanced flexibility and capability for sea-to-shore missions, the newest ESB will include a 52,000 square-foot flight deck, fuel and equipment storage, repair spaces, magazines, mission planning spaces and accommodations for up to 250 personnel.

Serving as a ‘pier at sea,’ the 784-foot-long ship is also designed to support MH-53 and MH-60 helicopters and MV-22 tilt rotor aircraft.

The ship, ESB 5, is the fifth to be added to a contract between NASSCO and the US Navy that originally called for two Expeditionary Transfer Docks - USNS Montford Point (T-ESD 1) and USNS John Glenn (T-ESD 2).

The first two ships, formerly classified as Mobile Landing Platforms (MLPs), were designed and constructed by NASSCO to support vehicle staging and transfers, and the movement of LCAC vessels.

In 2012, a third ship, USNS Lewis B. Puller (T-ESB 3), was added to the contract and reconfigured as an ESB, formerly known as a MLP Afloat Forward Staging Base, to support a wide range of military operations. All three ships have been delivered to the U.S. Navy, and in October 2015, NASSCO began construction on ESB 4, USNS Hershel “Woody” Williams, the Company said.

Tags:

US  Navy  Ship  GD  NASSCO  Military  
Line Spacing+- AFont Size+- Print Article

Other Related News

L&T signs deal with S Korea's HTW to supply howitzer to army

Engineering conglomerate Larsen and Toubro inked a deal with South Korean defence major Hanwha Techwin (HTW) on Friday to jointly manufacture over 100 self- propelled howitzers for Indian Army at a cost of nearly Rs 4,500 crore.

Upcoming Defence Exhibitions

BRAHMOS Missile Systems

Headlines

Brahmand World Defence Update 2017

Image Gallery